Avoiding the Pitfalls: Common Cost Estimation Mistakes in Manufacturing

Jul 09, 2025

In manufacturing, cost estimation is more than just a budgeting exercise, it's the foundation for pricing, profit, and long-term business health.

Yet even experienced teams fall into traps that can distort reality, inflate costs, or worse — underquote and erode margin.

Below are some of the most common mistakes I’ve seen over the years, and how to avoid them.

  1. Relying too heavily on top-down estimates

Many manufacturers default to simple cost formulas:

Material + Labour + Overhead Rate + Margin = Price

It looks neat on paper, but it hides what’s really going on underneath.

What’s missing? Often, the overhead rate is a broad average that doesn’t reflect the actual resources used by the product.
What’s the risk? You might be subsidising complex parts with simple ones, or quoting blind on new components.

Fix: Use a bottom-up approach wherever possible, build the cost from raw materials and operations, not just from spreadsheet averages.

  1. Ignoring indirect and hidden costs

It’s easy to focus on direct costs like materials and operator time. But many products carry hidden extras:

  • Tooling and fixture depreciation
  • Packaging design and logistics
  • Setup and changeover time
  • Quality assurance or testing

Leaving these out leads to underestimating the true cost of production and over-promising to customers.

Fix: Build a checklist of indirects to consider with every estimate. Don’t assume “someone else is covering it.”

  1. Using outdated data

That quote from 18 months ago? It may no longer apply.

Material prices change.
Labour rates move.
Supplier capability evolves.

When cost data isn’t refreshed, estimates drift further from reality. What looks profitable on the spreadsheet might bleed margin on the floor.

Fix: Create a rhythm for updating costing inputs. Even quarterly reviews of high-volume or high-risk parts can make a difference.

  1. No collaboration between teams

Costing is often handled in isolation by buyers, engineers, or finance. But each department sees a different part of the picture.

Without shared input:

  • Engineering might design a part without knowing the production impact
  • Procurement might negotiate without understanding technical alternatives
  • Finance might price without real process cost data

Fix: Build cross-functional reviews into your cost estimation process. Shared understanding leads to smarter decisions.

  1. No post-mortem on actual vs. estimated costs

Once a job is delivered, few teams take time to look back. But that’s where the gold is.

Was the quote accurate?
Did labour take longer than planned?
Did rework eat into margins?

Without feedback, costing stays theoretical, and mistakes get repeated.

Fix: Introduce simple “actual vs. estimate” reviews on key projects. Even a 30-minute debrief can surface valuable insights.

Costing is Not a One-Time Task

Great estimates don’t come from clever formulas, they come from clear processes, current data, and team alignment.

If your costing process feels like a best guess, now’s the time to tighten it up.

Small improvements here can protect your margins, sharpen your pricing, and give your team the confidence to move fast without fear of surprises.

Free Training

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Cras sed sapien quam. Sed dapibus est id enim facilisis, at posuere turpis adipiscing. Quisque sit amet dui dui.

Start today

Stay connected with news and updates!

Join our mailing list to receive the latest news and updates from our team.
Don't worry, your information will not be shared.

We hate SPAM. We will never sell your information, for any reason.